Does my ADU need solar?
Generally, yes for a new detached ADU — and an existing system on the main house usually doesn’t cover it. Here’s the actual rule and where the exceptions are.
A new detached ADU generally needs its own PV system
A newly constructed, detached ADU is generally treated as new construction under Title 24 — and new residential construction generally requires a newly installed solar PV system sized for that unit. An existing PV array on the main house doesn’t automatically satisfy the ADU’s requirement on its own — new modules can sometimes be added to an existing array, but they have to be sized and permitted specifically for the ADU, not just left as-is.
There are exceptions that come up often enough to be worth knowing before you assume the worst case:
- No PV required if the calculated minimum system size works out to under 1.8 kWdc — common on a small ADU footprint.
- No PV required if the available Solar Access Roof Area is under 80 contiguous square feet — heavy shading or a small/complex roof can trigger this.
- JADUs and interior or attached ADUs are generally treated as alterations rather than new construction, so they’re generally not subject to the new-construction PV mandate at all.
- A garage conversion to ADU is generally treated as an alteration too — generally exempt from the same-mandate for the same reason.
“Generally” is doing real work in those sentences — solar sizing depends on the specific project, roof, and how the local building department interprets the exceptions. Send the plans and the model will tell you exactly where your project lands, with the assumption stated plainly, not buried.
Prices
Flat fees, in writing before I start. No hourly, no bid package, no change-order games — the number on the quote is the number on the invoice.
Your first report with me
One per client, homes under 3,000 square feet. Full energy model, CF1R and CHEERS registration. It’s a test run — send one job and see how it goes.
Every model after the first
The standard rate once you’re a client — the second building, ADU plus main house, the next project that walks in. Back in 3 business days.
Over 3,000 square feet
Quoted from the plans before any work starts, same day.
24×36 plan-sheet set
Your CF1R laid out full size, matched to your drawing set. Comes back as a PDF you drop straight in.
Revisions
Two revisions included, plus questions any time. Past two I quote first, before I touch it.
Commercial / tenant improvement
Send the plans and you’ll have a flat quote back the same day. No deposit, no minimum.
How it works
-
01
Send the plans
A PDF of the architecturals and the project address. If something’s missing I ask once, in one email — not five.
Mechanical and plumbing don’t have to be picked yet. If the plans don’t call out the HVAC or the water heater, I model what I’d normally specify for that job and tell you exactly what I assumed. Change any of it and I’ll rerun — that’s not a revision.
-
02
I build the model
If the design does not comply as drawn, I tell you what the model needs to pass and the least disruptive way I can find to get there — your call what goes on the drawings.
-
03
You get it back ready to sign
CF1R registered with CHEERS, you named as the responsible designer. 3 business days — 24–48 hours on your first one. Pay on delivery: Zelle, Venmo or Cash App.
One honest note
I’m not a licensed engineer or architect, and I don’t stamp drawings. On the CF1R I’m the documentation author — you stay the responsible designer. Nothing about your role on the job changes.
That’s on purpose. I’m not after your scope or your clients. I do one piece of the permit set — the piece that usually holds it up — and I do it fast.
ADU solar questions
If yours isn’t here, see the full FAQ or call and ask.
Does my ADU or addition actually need one?
Almost certainly. New conditioned floor area — ADUs, JADUs, garage conversions, additions — triggers Title 24. So do alterations that touch the envelope, the ductwork, or the HVAC equipment, including a straight change-out. A remodel that only moves non-structural interior partitions usually doesn’t.
Send it either way. If it doesn’t need a report I’ll say so and there’s no charge for the look.
Does a garage conversion ADU need solar?
Does a JADU need solar?
Can I just add panels to my house's existing solar array instead of a separate ADU system?
Find out where your ADU lands.
Send the plans and the CF1R comes back with the solar requirement (or exemption) stated plainly, not buried in an appendix.