T24Studio
How it works · California

Who can prepare a Title 24 report?

Two roles show up on a CF1R, and they’re not the same person by default. Here’s how the split works, and where T24 Studio sits in it.

Two roles, one form

Documentation author and responsible designer aren't the same role

A CF1R names two roles. The documentation author is whoever built the energy model and prepared the compliance paperwork — that’s T24 Studio’s role on every job. The responsible designer is the architect, engineer, or designer of record on the project — that stays you. The CF1R registers you as the responsible designer regardless of who authored the documentation; nothing about your role or your relationship with your client changes because the energy modeling was outsourced.

T24 Studio is not a licensed engineer or architect and doesn’t stamp drawings — that’s stated plainly, not a limitation being worked around. The documentation-author role is specifically the piece of the permit set that’s energy-compliance modeling and paperwork; it’s not standing in for the stamped structural, architectural, or civil work your project still needs from its licensed professionals.

Practically, this is why sending plans to T24 Studio doesn’t change anything about who signs off on the rest of the permit set — it adds the CF1R to the stack, registered and ready, with your name on it as the designer who owns the project.

Rates

Prices

Flat fees, in writing before I start. No hourly, no bid package, no change-order games — the number on the quote is the number on the invoice.

New client offer

Your first report with me

$150$9924–48 hours

One per client, homes under 3,000 square feet. Full energy model, CF1R and CHEERS registration. It’s a test run — send one job and see how it goes.

Every model after the first

$150Per model

The standard rate once you’re a client — the second building, ADU plus main house, the next project that walks in. Back in 3 business days.

Over 3,000 square feet

QUOTED

Quoted from the plans before any work starts, same day.

24×36 plan-sheet set

$20

Your CF1R laid out full size, matched to your drawing set. Comes back as a PDF you drop straight in.

Revisions

FREEFirst two

Two revisions included, plus questions any time. Past two I quote first, before I touch it.

Commercial / tenant improvement

QUOTEDSame day

Send the plans and you’ll have a flat quote back the same day. No deposit, no minimum.

Process

How it works

  1. 01

    Send the plans

    A PDF of the architecturals and the project address. If something’s missing I ask once, in one email — not five.

    Mechanical and plumbing don’t have to be picked yet. If the plans don’t call out the HVAC or the water heater, I model what I’d normally specify for that job and tell you exactly what I assumed. Change any of it and I’ll rerun — that’s not a revision.

  2. 02

    I build the model

    If the design does not comply as drawn, I tell you what the model needs to pass and the least disruptive way I can find to get there — your call what goes on the drawings.

  3. 03

    You get it back ready to sign

    CF1R registered with CHEERS, you named as the responsible designer. 3 business days — 24–48 hours on your first one. Pay on delivery: Zelle, Venmo or Cash App.

Disclosure

One honest note

I’m not a licensed engineer or architect, and I don’t stamp drawings. On the CF1R I’m the documentation author — you stay the responsible designer. Nothing about your role on the job changes.

That’s on purpose. I’m not after your scope or your clients. I do one piece of the permit set — the piece that usually holds it up — and I do it fast.

Questions

Roles & responsibility questions

If yours isn’t here, see the full FAQ or call and ask.

Who signs it — and does my role change?

Nothing about your role changes. On the CF1R I’m the documentation author. You stay the responsible designer and the registered document names you as such. I’m not a licensed engineer or architect and I don’t stamp drawings — that’s deliberate, not a limitation I’m working around.

What exactly is a CF1R?

The Certificate of Compliance for low-rise residential work, commonly called a Title 24 report — the form that proves the design meets California’s Title 24, Part 6 energy standards. Plan check will not issue the permit without it. It comes out of an energy model built in CBECC-Res, registered with a data registry, and signed by the responsible designer. That whole chain is what you’re handing me.

Do I need to be a licensed architect or engineer to submit a CF1R?
The responsible designer named on a CF1R is whoever's serving as designer of record on the project — not every project requires that to be a licensed architect or engineer (an owner-builder or a permit designer can be the responsible designer on many residential jobs). What licensing your specific project needs is a question for your local building department, not something a documentation-author service like T24 Studio determines.

Keep your role exactly as it is.

Send the plans, T24 Studio handles the modeling and paperwork, you stay the designer of record.