Anaheim says staff should be able to issue an ADU Express building permit within one day, and still puts the Title 24 report on the owner — so the energy documentation is what decides whether that day happens.
A one-day permit that still waits on your CF1R
Anaheim takes plans through GoPost, and nothing routes until payment clears. It is one of few cities publishing a review-time table at all — over the counter 0–2 days, medium 10, major 20, mega 25 working days, resubmittals at 5, 10 and 13 — though that Review Timeframes handout is date-stamped December 30, 2013. A residential addition under 2,000 sf lands in the medium tier; a new home is major. Over the counter is defined by a stopwatch: work needing no more than 30 minutes of review.
The ADU Express track is the interesting one. Staff should be able to issue the approved building permit all within one day, and the pre-approved catalogue holds four free plans from 224 to 1,199 sf — yet the city says a pre-approved plan may still require the owner to work with a design professional to finalize the set, naming Title 24 alongside the site plan and structural details. One local habit to get right: Anaheim tells you not to cloud corrections on a resubmittal — narrative instead — and to cloud changes only after the permit issues. That is the reverse of most cities, and an easy way to earn a second round of comments. Anaheim is climate zone 8, on the 2025 code cycle, with no local energy reach code beyond the state code.
One thing that doesn’t change by city: my price and turnaround are flat statewide — $99 first report, $150 flat after, 24–48 hours on your first job. What differs city to city is what happens on the plan-check side before and after the CF1R lands in your permit set, which is what this page covers.
Prices
Flat fees, in writing before I start. No hourly, no bid package, no change-order games — the number on the quote is the number on the invoice.
Your first report with me
One per client, homes under 3,000 square feet. Full energy model, CF1R and CHEERS registration. It’s a test run — send one job and see how it goes.
Every model after the first
The standard rate once you’re a client — the second building, ADU plus main house, the next project that walks in. Back in 3 business days.
Over 3,000 square feet
Quoted from the plans before any work starts, same day.
24×36 plan-sheet set
Your CF1R laid out full size, matched to your drawing set. Comes back as a PDF you drop straight in.
Revisions
Two revisions included, plus questions any time. Past two I quote first, before I touch it.
Commercial / tenant improvement
Send the plans and you’ll have a flat quote back the same day. No deposit, no minimum.
One honest note
I’m not a licensed engineer or architect, and I don’t stamp drawings. On the CF1R I’m the documentation author — you stay the responsible designer. Nothing about your role on the job changes.
That’s on purpose. I’m not after your scope or your clients. I do one piece of the permit set — the piece that usually holds it up — and I do it fast.
Anaheim plan-check questions
If yours isn’t here, see the full FAQ or call and ask.
Does Anaheim publish how long plan check takes?
Does an ADU Express or pre-approved plan include the energy report?
Does my ADU or addition actually need one?
Almost certainly. New conditioned floor area — ADUs, JADUs, garage conversions, additions — triggers Title 24. So do alterations that touch the envelope, the ductwork, or the HVAC equipment, including a straight change-out. A remodel that only moves non-structural interior partitions usually doesn’t.
Send it either way. If it doesn’t need a report I’ll say so and there’s no charge for the look.
How fast do I get it back?
24 to 48 hours on your first job, three business days for everything after that — a date you can put on the schedule, not an estimate. If your permit deadline is tighter than that, say so in the notes; I’ll tell you honestly whether I can hit it before you commit.
Send your Anaheim plans.
The CF1R comes back fast enough to keep an ADU Express submittal on its one-day path instead of parked at the counter.