T24Studio
Service area · San Mateo County

Title 24 reports for Menlo Park permits.

Menlo Park is the rare city whose energy reach code fires on construction cost rather than square footage. Cross $100,000 on a house built before 2011 and you owe two extra energy measures — and the $100,000 moves up every January 1 whether the council meets or not.

Local plan check

A dollar trigger that moves every January

Menlo Park’s reach code is codified and CEC-approved for the 2025 code: Ordinance 1127, adopted 11/4/2025, Energy Commission approval 4/27/2026, codified at MPMC Chapters 12.16 and 12.18, current through 06-09-2026. It sits on the approved list twice, and the older listing is a trap: Ordinance 1124 was approved against the 2022 Energy Code on 11/12/2025, eight days after 1127 repealed 1124’s sections. A separate 2022-cycle PV reach code, Ordinance 1093, was approved 4/12/2023 for multifamily, hotel and nonresidential.

MPMC 12.16.020 catches an alteration to a single-family building originally constructed before 2011 at a stated project valuation of $100,000 or more; 12.16.010 runs the same test on an addition. The obligation: two items off the nine-measure Flex-Path menu — R-49 attic plus air sealing, duct sealing, R-13 walls, R-19 raised floor, pipe and tank insulation, 45 lumens-per-watt lamps, gas furnace to heat pump, gas water heater to heat pump water heater, or a Home Energy Score recommendation — documented in the plan set at application, field-verified by the City Building Inspector during construction. The $100,000 adjusts each January 1 against the California Construction Cost Index. A Home Energy Score of 7 or better within five years exempts the project. Separately, MPMC 12.18.110 makes a replaced or upgraded air conditioning condensing unit come back as a heat pump, naming no climate zone in the section — Menlo Park is Climate Zone 3, and no neighbor’s zone-4 language appears. The off-ramp on that change-out is a 20 percent cost differential, on the city’s AC to HP Unreasonable Hardship Form.

One thing that doesn’t change by city: my price and turnaround are flat statewide — $99 first report, $150 flat after, 24–48 hours on your first job. What differs city to city is what happens on the plan-check side before and after the CF1R lands in your permit set, which is what this page covers.

Rates

Prices

Flat fees, in writing before I start. No hourly, no bid package, no change-order games — the number on the quote is the number on the invoice.

See the full rate card

Disclosure

One honest note

I’m not a licensed engineer or architect, and I don’t stamp drawings. On the CF1R I’m the documentation author — you stay the responsible designer. Nothing about your role on the job changes.

That’s on purpose. I’m not after your scope or your clients. I do one piece of the permit set — the piece that usually holds it up — and I do it fast.

Questions

Menlo Park plan-check questions

If yours isn’t here, see the full FAQ or call and ask.

Which two measures does the $100,000 threshold buy me?
Any two off the nine-measure Flex-Path list, and the choice is yours. The two fuel-substitution options carry their own carve-outs: the Building Official shall not require them where the existing system is not configured for conversion to forced air, where their cost would exceed 20 percent of total project cost or force substantial construction outside the project area, or where other law prohibits it. A Home Energy Score of 7 or better skips the whole thing.
How does Menlo Park take a submittal, and how fast?
Entirely on paper-free Accela — the building permitting process, from application submittal to permit issuance, is entirely paperless, and there is no over-the-counter review at all. City Hall runs a 9/80 calendar, Monday to Thursday with alternate Fridays closed, and walk-in code questions only from 1 to 5 p.m. Menlo Park publishes no building plan-check turnaround. The 15-business-day and 60-calendar-day clock you may have seen is the planning-side ADU process, not plan check.
What do you need from me to start?

A PDF of the architecturals and the project address. Floor plans, elevations and a window schedule is plenty.

You don’t need the HVAC or water heater picked. If the plans don’t call them out, I model what I’d normally specify for that job — and I list every assumption in the email so nothing is buried. Swap any of it and I rerun; that doesn’t count against your free revisions.

The design doesn’t have to be finished either. Early is often better, because that’s when a compliance problem is still cheap to fix.

Does my ADU or addition actually need one?

Almost certainly. New conditioned floor area — ADUs, JADUs, garage conversions, additions — triggers Title 24. So do alterations that touch the envelope, the ductwork, or the HVAC equipment, including a straight change-out. A remodel that only moves non-structural interior partitions usually doesn’t.

Send it either way. If it doesn’t need a report I’ll say so and there’s no charge for the look.

Send your Menlo Park plans.

Put the stated project valuation in the notes — that number, against the house’s original construction year, decides whether two Flex-Path measures have to be picked and drawn into the set alongside the Title 24 Energy Code Calculations sheet.