Vista is Climate Zone 7 and San Marcos is Climate Zone 10, so the same plan does not model the same on both sides of the line — and only San Marcos publishes its zone, with a note telling you to go confirm it.

Local plan check

A city line that changes the energy model

Vista still takes permits at a counter: applications must be submitted in person at the Development Services Counter, and only qualifying SolarApp+ photovoltaic projects can go in online. The new-dwelling checklist asks for three paper sets, two copies of the energy compliance information, and says the energy forms shall be made part of the plans. Its room-addition handout carries a 75 percent cliff — addition plus two years of remodel work above 75 percent of the existing structure’s valuation, and the project shall meet the requirements for a new single-family residence, sprinklers included. That handout still names CF-1R-ADD-02-E and CF1R-ALT-02-E, footered Updated 07/2023 — its own text, not the forms a 2025-cycle project files.

San Marcos is the mirror image — all permitting is managed through the online system, with a published target of about 15 business days. It also publishes its own climate zone and tells you to go check it: primarily Climate Zone 10, confirm by checking the energy.ca.gov website, as climate zones can change. That warning earns its place, because Vista is Climate Zone 7 and San Marcos is Climate Zone 10. On the pre-approved ADU side the split repeats. Vista waives plan-check fees on four plans — 499, 745, 749 and 1,149 sf — and still lists a site-specific Title 24 energy compliance report (CF1R) as a submittal item. San Marcos’s PRADU plans may not be altered at all, and its complete-application list names no energy item. Neither city amends the Energy Code: VMC 16.26.010 and SMMC 17.04.010 each adopt it without amendment.

One thing that doesn’t change by city: my price and turnaround are flat statewide — $99 first report, $150 flat after, 24–48 hours on your first job. What differs city to city is what happens on the plan-check side before and after the CF1R lands in your permit set, which is what this page covers.

Rates

Prices

Flat fees, in writing before I start. No hourly, no bid package, no change-order games — the number on the quote is the number on the invoice.

See the full rate card

Disclosure

One honest note

I’m not a licensed engineer or architect, and I don’t stamp drawings. On the CF1R I’m the documentation author — you stay the responsible designer. Nothing about your role on the job changes.

That’s on purpose. I’m not after your scope or your clients. I do one piece of the permit set — the piece that usually holds it up — and I do it fast.

Questions

Vista & San Marcos plan-check questions

If yours isn’t here, see the full FAQ or call and ask.

How does a set of plans actually get filed in each city?
Opposite ways. Vista says permit applications must be submitted in person at the Development Services Counter, with only qualifying SolarApp+ photovoltaic projects accepted online, and its new-dwelling checklist asks for three paper sets plus two copies of the energy compliance information. San Marcos says all permitting is managed through its online building permitting system, and publishes a review target — this typically takes about 15 business days.
San Marcos says to go confirm its climate zone. Why?
Because zones do not follow city lines. San Marcos’s design-criteria sheet reads primarily Climate Zone 10, confirm by checking the energy.ca.gov website, as climate zones can change. Vista, next door, is Climate Zone 7 in the Energy Commission’s ZIP data and publishes no zone of its own. Same floor plan, different prescriptive envelope — which is why I set the zone from the address, not the city name.
Does my ADU or addition actually need one?

Almost certainly. New conditioned floor area — ADUs, JADUs, garage conversions, additions — triggers Title 24. So do alterations that touch the envelope, the ductwork, or the HVAC equipment, including a straight change-out. A remodel that only moves non-structural interior partitions usually doesn’t.

Send it either way. If it doesn’t need a report I’ll say so and there’s no charge for the look.

What do you need from me to start?

A PDF of the architecturals and the project address. Floor plans, elevations and a window schedule is plenty.

You don’t need the HVAC or water heater picked. If the plans don’t call them out, I model what I’d normally specify for that job — and I list every assumption in the email so nothing is buried. Swap any of it and I rerun; that doesn’t count against your free revisions.

The design doesn’t have to be finished either. Early is often better, because that’s when a compliance problem is still cheap to fix.

Send your Vista or San Marcos plans.

Say which city in the notes — that one word sets Zone 7 or Zone 10, and the CF1R comes back ready to print into Vista’s paper sets or upload to the San Marcos portal.